Delivery time 1 day

  • Because every M3 door construction slides left and right!
    • Shared rail with four notches for left and right, hermetic;
    • Door handle die that can be installed either on the left or the right;
    • Panels horizontally installed;
    • Universal floor guide.
  • Because you can cover every clear opening of 800 - 2500 mm with 4 graduated sizes.
  • Because colour choices do not apply to the stainless steel model.
  • Because there are two colour choices with regard to our galvanised steel model.
  • Because an M3 door kit can also be supplied with panels.
  • Because assembly and installation can take place on site (at the customer’s).

1 day delivery time:

  • For every service job
  • For every urgent order
  • For every customer site change
print